Language
Home> Global Cases> Sudan 700t/d Rock Gold Mineral Processing Plant
Sudan 700t/d Rock Gold Mineral Processing Plant
CASES

Sudan 700t/d Rock Gold Mineral Processing Plant

The Sudan 7000t/d gold mineral processing plant was an EPC+M+O project. The ore of this project contained 2.97g/t of gold, most of which were earthy minerals with particle size below 2mm. A small part of the ore was blocky minerals, and the maximum particle size was 70mm.

Xinhai Solution

01

One-stage open-circuit crushing

02

One-stage closed-circuit grinding

03

CIP-desorption electrolysis-smelting

04

Press filtering and tailings dry stacking

Main Equipment

Project Result

Sudan 700t/d Rock Gold Mineral Processing Plant

The project produced qualified products which brought substantial profits, and created new job opportunities. Effective measures were taken for the disposal of waste water and gas, leaching slag, smelting gas, tailings, dust and garbage and the control over noise. As a result, economic, environmental and social benefits were achieved.

Project Site

Sudan 700t/d Rock Gold Mineral Processing Plant
Sudan 700t/d Rock Gold Mineral Processing Plant
Sudan 700t/d Rock Gold Mineral Processing Plant


Mineral Processing
EPC and Equipment

Tel: +8613683147042
E-mail: xhxu@xinhaimining.net
Support: 北京鑫互联科技有限公司

Home About us EPC Products Solutions Cases News Contact Us 3D Exhibition Room
sitemap   © 2014 Shandong Xinhai Mining Technology & Equipment Inc.

Leave Message
contact
Leave Message
contact